Implementation Roadmap

Purpose

This document defines the planned implementation order for the Xterra Overland Power & Monitoring Dashboard.

The goal is to build the system incrementally, validating hardware and software at each stage before adding additional complexity.


Current Status

Complete

  • Project architecture defined
  • Hardware architecture defined
  • UART protocol defined
  • Pico architecture defined
  • UI wireframes defined
  • ESP32 firmware compiles
  • Simulator exists and functions

In Progress

  • ESP32 controller firmware
  • Communication protocol implementation

Not Started

  • Pico firmware
  • Display integration
  • Touch integration
  • Buzzer integration
  • End-to-end communications

Milestone 1: ESP32 Hardware Bring-Up

Goal

Verify cargo-controller hardware.

Tasks

  • Flash ESP32 firmware
  • Verify boot process
  • Verify AP mode
  • Verify HTTP API
  • Verify relay outputs
  • Verify DS18B20 framework
  • Verify UART initialization

Success Criteria

  • ESP32 boots reliably
  • Relay outputs function correctly
  • Status API responds correctly
  • No crashes or watchdog resets

Milestone 2: Pico Hardware Bring-Up

Goal

Verify dashboard hardware.

Tasks

  • Verify Pico 2 W operation
  • Verify ST7796S display
  • Verify FT6336U touch controller
  • Verify buzzer operation

Success Criteria

  • Display initializes reliably
  • Touch events are detected
  • Buzzer can be activated

Milestone 3: UART Communications

Goal

Establish communications between Pico and ESP32.

Tasks

  • Wire UART over CAT5
  • Implement status requests
  • Implement status responses
  • Implement relay commands
  • Implement error handling
  • Implement communication timeout detection

Success Criteria

  • Pico receives live status
  • Pico can control relays
  • Communication loss is detected

Milestone 4: Dashboard UI Foundation

Goal

Render live data on the touchscreen.

Tasks

  • Create screen manager
  • Create app state
  • Create dashboard screen
  • Create navigation bar
  • Create communication status indicators

Success Criteria

  • Live battery data displayed
  • Live temperature data displayed
  • Navigation functional

Milestone 5: Detailed Screens

Goal

Implement all planned screens.

Tasks

Battery Screen

  • SOC
  • Voltage
  • Current
  • Runtime
  • Temperature

Temperature Screen

  • Fridge Zone 1
  • Fridge Zone 2
  • Rear Seat
  • Outside Air

Power Screen

  • Starlink control
  • Fridge control

System Screen

  • Communication status
  • Sensor status
  • Firmware information

Success Criteria

  • All screens functional
  • Navigation stable
  • Live updates working

Milestone 6: Alarm System

Goal

Implement alerting and warning system.

Tasks

  • Alarm manager
  • Alarm overlay
  • Communication alarms
  • Battery alarms
  • Temperature alarms
  • Sensor fault alarms
  • Buzzer manager

Success Criteria

  • Alarms trigger correctly
  • Alarm overlay displays correctly
  • Buzzer alerts function correctly

Milestone 7: DS18B20 Integration

Goal

Implement all production sensors.

Sensors

Fridge Zone 1

Monitor refrigerator compartment.

Fridge Zone 2

Monitor freezer compartment.

Rear Seat Area

Monitor passenger compartment.

Outside Air

Monitor ambient exterior temperature.

Success Criteria

  • All sensors report correctly
  • Sensor failures are detected

Milestone 8: JBD/Xiaoxiang BMS Integration

Goal

Replace simulated battery data with live battery data.

Tasks

  • BLE communication
  • Battery status retrieval
  • Runtime calculations
  • Health monitoring

Success Criteria

  • Live battery data displayed
  • No simulated battery values required

Milestone 9: Vehicle Integration

Goal

Add vehicle-specific information.

Potential Features

  • Ignition state
  • OBD-II integration
  • CAN bus integration
  • Engine information
  • Fuel information

Status

Future planning only.


Milestone 10: Future Expansion

Potential Features

  • Additional relays
  • Inverter control
  • Lighting control
  • Starlink diagnostics
  • GPS integration
  • Home Assistant integration

Status

Future planning only.


Explicitly Not Planned

The following items are currently out of scope:

  • Cloud connectivity
  • Internet dependency
  • User accounts
  • Persistent logging
  • Historical graphing
  • Subscription services

The system should remain fully functional offline.