# Implementation Roadmap # Revised Milestone Order
## Purpose ## Milestone 1: ESP32 Hardware Bring-Up
This document defines the planned implementation order for the Xterra Overland Power & Monitoring Dashboard. ### Goal
The goal is to build the system incrementally, validating hardware and software at each stage before adding additional complexity.
---
# Current Status
## Complete
* Project architecture defined
* Hardware architecture defined
* UART protocol defined
* Pico architecture defined
* UI wireframes defined
* ESP32 firmware compiles
* Simulator exists and functions
## In Progress
* ESP32 controller firmware
* Communication protocol implementation
## Not Started
* Pico firmware
* Display integration
* Touch integration
* Buzzer integration
* End-to-end communications
---
# Milestone 1: ESP32 Hardware Bring-Up
## Goal
Verify cargo-controller hardware. Verify cargo-controller hardware.
## Tasks ### Tasks
* Flash ESP32 firmware - Flash ESP32 firmware
* Verify boot process - Verify WiFi AP
* Verify AP mode - Verify HTTP API
* Verify HTTP API - Verify relay outputs
* Verify relay outputs - Verify DS18B20 framework
* Verify DS18B20 framework - Verify UART initialization
* Verify UART initialization
## Success Criteria ### Success Criteria
* ESP32 boots reliably - ESP32 boots reliably
* Relay outputs function correctly - Relays operate correctly
* Status API responds correctly - HTTP API responds correctly
* No crashes or watchdog resets - No crashes or watchdog resets
--- ---
# Milestone 2: Pico Hardware Bring-Up ## Milestone 2: JBD/Xiaoxiang BMS Integration
## Goal ### Goal
Replace placeholder battery values with live battery telemetry.
### Tasks
- BLE communication
- JBD packet parsing
- Battery SOC
- Voltage
- Current
- Remaining Ah
- Runtime calculations
- Battery temperature
### Success Criteria
- Live battery telemetry available
- Battery data exposed through API
- Placeholder battery values removed
---
## Milestone 3: Pico Hardware Bring-Up
### Goal
Verify dashboard hardware. Verify dashboard hardware.
## Tasks ### Tasks
* Verify Pico 2 W operation - Display initialization
* Verify ST7796S display - Touch initialization
* Verify FT6336U touch controller - Buzzer verification
* Verify buzzer operation
## Success Criteria ### Success Criteria
* Display initializes reliably - Display functional
* Touch events are detected - Touch functional
* Buzzer can be activated - Buzzer functional
--- ---
# Milestone 3: UART Communications ## Milestone 4: UART Communications
## Goal ### Goal
Establish communications between Pico and ESP32. Connect Pico and ESP32.
## Tasks ### Tasks
* Wire UART over CAT5 - UART transport
* Implement status requests - Status requests
* Implement status responses - Status responses
* Implement relay commands - Relay commands
* Implement error handling - Error handling
* Implement communication timeout detection - Timeout detection
## Success Criteria ### Success Criteria
* Pico receives live status - Live data displayed on Pico
* Pico can control relays - Relay control operational
* Communication loss is detected
--- ---
# Milestone 4: Dashboard UI Foundation ## Milestone 5: Dashboard UI
## Goal ### Goal
Render live data on the touchscreen. Create the primary user interface.
## Tasks ### Tasks
* Create screen manager - Dashboard screen
* Create app state - Battery screen
* Create dashboard screen - Temperatures screen
* Create navigation bar - Power screen
* Create communication status indicators - System screen
## Success Criteria ### Success Criteria
* Live battery data displayed - All screens functional
* Live temperature data displayed - Navigation stable
* Navigation functional - Live updates working
--- ---
# Milestone 5: Detailed Screens ## Milestone 6: DS18B20 Integration
## Goal ### Goal
Implement all planned screens. Implement all production temperature sensors.
## Tasks ### Sensors
### Battery Screen - Fridge Zone 1
- Fridge Zone 2
- Rear Seat Area
- Outside Air
* SOC ### Success Criteria
* Voltage
* Current
* Runtime
* Temperature
### Temperature Screen - Sensors report correctly
- Sensor failures detected
* Fridge Zone 1
* Fridge Zone 2
* Rear Seat
* Outside Air
### Power Screen
* Starlink control
* Fridge control
### System Screen
* Communication status
* Sensor status
* Firmware information
## Success Criteria
* All screens functional
* Navigation stable
* Live updates working
--- ---
# Milestone 6: Alarm System ## Milestone 7: Alarm System
## Goal ### Goal
Implement alerting and warning system. Implement monitoring and alerting.
## Tasks ### Tasks
* Alarm manager - Alarm manager
* Alarm overlay - Alarm overlay
* Communication alarms - Buzzer integration
* Battery alarms - Communication alarms
* Temperature alarms - Battery alarms
* Sensor fault alarms - Temperature alarms
* Buzzer manager - Sensor fault alarms
## Success Criteria ### Success Criteria
* Alarms trigger correctly - Alarms trigger correctly
* Alarm overlay displays correctly - Audible alerts function correctly
* Buzzer alerts function correctly
--- ---
# Milestone 7: DS18B20 Integration ## Milestone 8: Vehicle Integration
## Goal ### Potential Features
Implement all production sensors. - Ignition state
- OBD-II
## Sensors - CAN bus
- Fuel level
### Fridge Zone 1 - Engine data
Monitor refrigerator compartment.
### Fridge Zone 2
Monitor freezer compartment.
### Rear Seat Area
Monitor passenger compartment.
### Outside Air
Monitor ambient exterior temperature.
## Success Criteria
* All sensors report correctly
* Sensor failures are detected
---
# Milestone 8: JBD/Xiaoxiang BMS Integration
## Goal
Replace simulated battery data with live battery data.
## Tasks
* BLE communication
* Battery status retrieval
* Runtime calculations
* Health monitoring
## Success Criteria
* Live battery data displayed
* No simulated battery values required
---
# Milestone 9: Vehicle Integration
## Goal
Add vehicle-specific information.
## Potential Features
* Ignition state
* OBD-II integration
* CAN bus integration
* Engine information
* Fuel information
## Status
Future planning only. Future planning only.
--- ---
# Milestone 10: Future Expansion ## Milestone 9: Future Expansion
## Potential Features ### Potential Features
* Additional relays - Additional relays
* Inverter control - Inverter control
* Lighting control - Lighting control
* Starlink diagnostics - GPS
* GPS integration - Starlink diagnostics
* Home Assistant integration - Home Assistant
## Status
Future planning only. Future planning only.
---
# Explicitly Not Planned
The following items are currently out of scope:
* Cloud connectivity
* Internet dependency
* User accounts
* Persistent logging
* Historical graphing
* Subscription services
The system should remain fully functional offline.